Additive Manufacturing
Precision Machining
Quality Assurance
Quality Assurance
Every part is checked against your drawing before it leaves our workshop in Kortenberg. Critical dimensions are measured on our coordinate measuring machine (CMM), and the inspection documents you need travel with the parts.
BINDSOL is certified to ISO 9001:2015 by DQS (certificate no. 30050979 QM15, valid until January 2029). The scope covers metal 3D printing, CNC machining, finishing and related engineering services.
Inspected before shipping
No part leaves without a final check against the drawing. Critical dimensions are measured on the CMM.
Documented on request
Certificate of conformity, CMM report, first article inspection, material certificate, roughness report or PPAP: tell us what you need with the RFQ.
Traceable
Bar stock and metal powder are identified by batch, so every part can be traced back to the material it was made from.
One supplier, one responsibility
Metal 3D printing, CNC machining, wire EDM, heat treatment and inspection run in our own workshop. Coatings, anodising and other specialist processes come from approved partners. BINDSOL orders them, checks the result and delivers the finished part, so you have one contact and one party responsible.
The steps of every order
- Drawing and feasibility review. We check tolerances, materials and critical features before quoting, and raise open questions with you first. Where the drawing gives no general tolerance, ISO 2768-m applies.
- Material control. Bar stock and metal powder are bought from qualified sources and identified by batch.
- Process planning. Printing, stress relief, machining, wire EDM and finishing are planned as one chain, including datums and machining allowance for 3D printed parts.
- In-process checks. Operators measure during production and correct deviations before the next part.
- Final inspection. Critical dimensions are verified on our coordinate measuring machine (CMM).
- Marking and documentation. Parts are laser-marked where required. Automotive customers receive PPAP Level 2 documentation with every batch, and inspection reports are supplied on request.
Prototype or short series: choose the level of control
A prototype and a series part do not need the same paperwork. Tell us which level you need when you send the RFQ, and it is priced into the quote.
| Prototype | Short series | |
|---|---|---|
| Before production | Drawing and feasibility review | Drawing review plus agreed inspection plan and documentation pack |
| During production | Operator checks on critical features | First article inspection before the batch, then agreed sampling |
| Final check | Critical dimensions and visual inspection | Full or sampled CMM inspection as agreed |
| Documents | Dimensional report on request | CoC, FAI, material certificates, PPAP as required |
Documentation you can order
| Document | What it shows |
|---|---|
| Certificate of conformity (CoC) | Parts are made to your drawing, revision and order |
| CMM dimensional report | Measured values against the drawing tolerances |
| First article inspection (FAI) | Full check of the first part before a batch is released |
| Material certificate | Bar stock or powder batch with chemical composition |
| Surface roughness report | Measured Ra / Rz on the specified faces |
| PPAP | Production part approval documentation for automotive programmes |
What we measure
- Geometry and GD&T on a tactile coordinate measuring machine with scanning probe
- Surface roughness (Ra, Rz) on machined and finished faces
- In-process dimensions with calibrated hand gauges at the machine
Measuring equipment is calibrated and controlled within our ISO 9001 quality system.
Metal 3D printed parts
A printed part is only as good as its machined interfaces. That is why printing, stress relief, machining and inspection stay in one workshop.
- Every build is linked to its powder batch
- Stress relief and heat treatment are done in-house
- Functional faces are machined and measured on the CMM against machined datums
- Most of our prints are AlSi10Mg and 316L, with established process settings
Who checks what
Quality is not only a final check. The operator who runs the machine measures the part during production. Final inspection on the CMM is done before the parts are packed. Anyone in the workshop can stop a job if something looks wrong.
How we control partner processes
Coatings, anodising and other outsourced steps come from a fixed group of partners we know. Parts coming back from a partner are inspected before they ship to you, and partner certificates are added to your documentation when required.
If something is not right
Tell us what you found, with photos or measurements. We investigate, explain the root cause and agree with you whether the part is reworked or remade. The cause is recorded in our ISO 9001 corrective action process so it does not repeat.
Frequently asked questions
Is BINDSOL ISO 9001 certified?
Yes. BINDSOL is certified to ISO 9001:2015 by DQS (certificate no. 30050979 QM15, valid until January 2029). You can download the certificate on this page.
Which inspection documents can I get?
Certificate of conformity, CMM dimensional report, first article inspection report, material certificates, surface roughness reports and PPAP documentation. Tell us what you need with your RFQ.
Which general tolerance applies if my drawing has none?
ISO 2768-m, unless the drawing or order states otherwise.
How do you handle very tight tolerances?
We review every tolerance before quoting. If a tolerance cannot be held or measured reliably, we say so in the quote and propose an alternative.
How are 3D printed metal parts traced?
Every build is linked to its metal powder batch, and the part is inspected after machining on the CMM.
What happens if a part does not meet the drawing?
We investigate, explain the root cause and agree with you on rework or a remake. The cause is handled in our ISO 9001 corrective action process.